Infrastructure
ELECTRICITY SUPPLY
- 220 KV SOURCE: a 220 KV transform station with capacity ranging from 20 x 125 MVA to 2 x 250 MVA.
- 110 KV source: The no.1 110/22KV transform station with capacity 3 x 63 MVA (2 machines under operation and one back-up) and the no.2 110 KV transform station with capacity 2 x 40MVA.
WATER SUPPLY
- The outer water supply system is supplied from Da River supply project with the capacity of 60.000m3/day.
- The inner water supply system with the capacity of 4.500 m3/day.
- Water supplied meets Vietnamese Standard called TCXD VN 33-2006 and some standards of Japan.
WASTE WATER TREATMENT SYSTEM
- Waste water inside the Park would be partial treated before being comprehensive treated at the waste water treatment plans; treated water has to meet the A standard for industrial waste water - TCVN 5945-2005.
- The no.1 waste water treatment plan (in the North area) has the capacity of: 26.000 m3/day.
- The no.2 waste water treatment plan (in the South area) has the capacity of: 8.000 m3/day.
TELECOMMUNICATIONS
- Provided by: VNPT, VIETTEL, EVN,…
- Wired and wireless data transmission.
- Interoperability between the national and international networks.
- Bandwidth supports high-speed Internet access: ISDN, XDSL, FE/GE 100M/1000M, WLAN 11/22Mbps.
More Articles
- • Strategic location
- • For Investment
- • Establishment Development
- • About
- • One-door service
- • HHTP to evaluate Korean company’s technologies
- • Deputy Chairman of the Brunei Government Office visited HHTP
- • Vice President of KIAT to visit HHTP
- • HHTP’s Hotlines
- • FDI sector witnesses large trade surplus