ELECTRICITY SUPPLY

  • 220 KV SOURCE: a 220 KV transform station with capacity ranging from 20 x 125 MVA to 2 x 250 MVA.
  • 110 KV source: The no.1 110/22KV transform station with capacity 3 x 63 MVA (2 machines under operation and one back-up) and the no.2 110 KV transform station with capacity 2 x 40MVA.

WATER SUPPLY

  • The outer water supply system is supplied from Da River supply project with the capacity of 60.000m3/day.
  • The inner water supply system with the capacity of 4.500 m3/day.
  • Water supplied meets Vietnamese Standard called TCXD VN 33-2006 and some standards of Japan.

WASTE WATER TREATMENT SYSTEM

  • Waste water inside the Park would be partial treated before being comprehensive treated at the waste water treatment plans; treated water has to meet the A standard for industrial waste water - TCVN 5945-2005.
  • The no.1 waste water treatment plan (in the North area) has the capacity of: 26.000 m3/day.
  • The no.2 waste water treatment plan (in the South area) has the capacity of: 8.000 m3/day.

TELECOMMUNICATIONS

  • Provided by: VNPT, VIETTEL, EVN,…
  • Wired and wireless data transmission.
  • Interoperability between the national and international networks.
  • Bandwidth supports high-speed Internet access: ISDN, XDSL, FE/GE 100M/1000M, WLAN 11/22Mbps.