Modern and Synchronized Infrastructure

22:39 - 11/09/2016

Infrastructure is an important factor has been the Management Board of Hoa Lac Hi-Tech Park of particular interest to attract investors into the area. Major infrastructure in the area has been and will be built from two main sources are the state budget and the Japanese ODA loans.

For the infrastructure investment by the budget, the current Management Board of Hoa Lac Hi-tech Park is focusing on the completion of infrastructure projects to put into use. So far, traffic has basically been connected with frontage roads of Thang Long Highway and road systems in the functional areas of Hoa Lac Hi-tech Park. The Management Board of Hoa Lac Hi-Tech Park has completed and ongoing commissioning of wastewater treatment plant with capacity of 6,000 m3 / day / night and has completed 70% of the installation of water collection network Phase I. waste

To ensure an infrastructure system and modern synchronization, 18/3/2010, technical design work began to be implemented with a capital of 1,005 billion yen in loans as the loan agreement VNXVII-10. Dated 30.03.2012, the Ministry of Finance and the International Cooperation Agency of Japan (JICA) signed the first loan agreement for the construction phase is valued at 15.218 billion yen Infrastructure. It is expected that the total number of loans for the construction of about 28 billion yen, and the entire infrastructure of the area will be completed in late 2018.

A. The situation of investment and improvement of existing infrastructure:

Current infrastructure of Hoa Lac Hi-Tech Park was able to meet the basic requirements of the investors.

1 / Roads

   Asian. Northern Thang Long Avenue: Construction has about 17.2 kilometers.

   b. Southern Thang Long Boulevard: 2.58 km was constructed, was completed about 1 km.

2 / Water supply:

- From temporary water wells (capacity of 3,000 m3 / day) by the Company Viwaseen 6 offer.

3 / Wastewater:

- Completed the wastewater treatment plant capacity 6.000m3 / day and approximately 70% volume collection network. Currently the plant is not in operation officially collected by the network is incomplete.

4 / Power supply:

Hoa Lac High-Tech Park currently is temporarily using two power sources:

   + 22kV Electrical: 3x240mm cable system in technical Hao along a road side of some roads A, B, E, C issued by the construction manager.

   Electrical + 35kV, 10kV: Electricity Thach by the construction.

5 / Telecommunications

Currently the Hoa Lac Hi-Tech Park is using telecommunications services provider 3 is: VNPT Hanoi, Viettel and FPT

B. Information Infrastructure Development Project Infrastructure of Hoa Lac Hi-tech Park ODA by the Japanese government:

I.Ha technical floor in the North Thang Long Highway:

 1 / Power supply system:

   Power supply system includes:

    - Substation 110kV Hoa Lac 03 I scale 63MVA transformer, scheduled for completion in Quarter I / 2017

    - The system of 22kV power distribution line section 3x400mm2 cable, the total length of 75,5km; system distribution station (RMU cabinets) are 121 stations; system substation 22 / 0.4 kV at 11 stations (9 stations for lighting systems, one system stations Sewage pumping and booster pump station 1 for the water supply system). Expected to be completed in the first quarter / 2018.

2 / water system:

  Water for the Hoa Lac Hi-Tech Park will be allocated from the plumbing of the Da River Water Supply Project Phase 1.

  The water supply system is capable of providing 40 300 m3 / day for the entire Hoa Lac area include: capacity 6.000m3 tank and booster pump station; piping diameters from DN100 to DN800, total length of about 69km. Expected to be completed in the first quarter / 2018.

3 / wastewater systems:

  - Wastewater System includes: piping diameter from D150 - D1050, a total length of about 56km pipeline (of which 54km gravity pipe, pressure pipe 2km); intermediate pump stations is 12 stations. Expected to be completed in the first quarter / 2018.

  - Wastewater treatment plant: waste water is collected and after preliminary treatment will be directed to the wastewater treatment plant, with a capacity of up to 36,000 m3 / day (excluding module 6,000 m3 / day night finished). Waste water is treated by technology A20 with water quality criteria after treatment:

BOD5          :  20 mg/l

SS                 :  20 mg/l

T-N               :  15 mg/l

T-P                :   1 mg/l

Expected to be completed in the fourth quarter / 2017.

4 / telecom system:

  Telecommunications systems are designed to include: 96-core cable system; Conduits Cable and Cable 38 tanks.

  Expected completion of the first quarter / 2018.

5 / System fire prevention and fighting:

  Fire protection systems including fire alarms and fire extinguishing systems. Fire extinguishing systems including fire systems outside the house, water tank and fire pump station.

  Expected completion of the first quarter / 2018.

II. Technical infrastructure of the South Thang Long Highway:

1 / Power supply system:

 - Substation:

  Stage 1: to use the power of 110 / 22KV Hoa Lac 03 x 63MVA capacity built by Japanese ODA in Hoa Lac High-Tech Park North.

  Stage 2: using 03 circuits, power supply is 110 / 22KV, 40MVA capacity of 2 x new construction (not using power from a 110 / 22KV 63MVA capacity of 03 x more)

 - Grid systems: grid 22kV XLPE underground cable using plastic tubes placed in HDPE bearing, distance manholes around 45m. After the completion of phase 2, using 18 types of medium-voltage cabinets RMU-630A-20kA.

2 / water system:

 HTP Water for drinking water HL will be allocated from the plumbing of the Da River Water Supply Project (DACNSD). Using 01 water pumping capacity of 13,000 m3 / day.

3 / wastewater systems:

  - Wastewater System includes: piping diameters from D30 - D600, the total length of the pipeline is about 7,71km; intermediate pump stations is 02 stations.

  - Wastewater treatment plant: waste water is collected and after preliminary treatment will be directed to the wastewater treatment plant. The plant has a capacity of 8.000㎥ / day. Wastewater is treated up to Class A according to NTR 24: 2009 / BTNMT.

  - Handling of waste: industrial waste and activities are classified and transported for disposal according to current regulations, arranged 01 waste transfer station has an area 0,41ha.

4 / telecom system:

 Telecommunication systems signals sourced from highways Thang Long Highway, including: optical cable system; Cable Conduits, 01 main cabinet, 22 cabinet and 52 tanks threaded cable faster.

5 / System fire prevention and fighting:

 Fire protection system along the internal roads, the layout of the cock.